Bekasi – PGN and PGN Solution carried out first
welding for the construction of natural gas pipeline infrastructure to PT Fajar
Surya Wisesa (FajarPaper) (21/3). PGN Solution continues to support PGN in the
development of energy infrastructure in the expansion and utilization of
natural gas.
Fist welding was carried out at PT Fajar Surya Wisesa,
West Cikarang, which was attended by Director of Engineering & Development
PGN Solution Lebinner Sinaga, General Manager Sales Operation Region II (SOR
II) Sonny Rahmawan Abdi, and Sales PGN Bekasi Area Reza Maghraby. Sonny
Rahmawan Abdi said, "The construction of natural gas pipeline
infrastructure was built for the security of natural gas supply and the
provision of environmentally friendly energy."
This development has a 2 KM long pipe construction
with a diameter of 12 inches, the construction of which lasts for 3 months. The
natural gas required by FajarPaper is 11.67 to 17.5 BBTUD. Lebinner Sinaga also
stated "We are hereby committed to ensuring that the construction of gas
pipeline infrastructure can be carried out on time, in an efficient manner and
of the correct quality. Hopefully this development can run well, so that clean
and safe energy can be used in the industrial sector." This makes PGN Solution committed to supporting PGN in
meeting natural gas needs for the industrial sector, which is in line with the
government's target of encouraging economic growth through industry.